TE Connectivity Passive Product CP105908
CP105908
Please send RFQ , we will respond immediately.
TE Connectivity Passive Product CP105908 information
Type
Parameter
Factory Lead Time
20 Weeks
Published
2002
Series
CB10, Citec
Part Status
Active
Moisture Sensitivity Level (MSL)
1 (Unlimited)
Accessory Type
Thumbwheel
RoHS Status
RoHS Compliant
Aztec Electronics's Payment Terms
Aztec Electronics offers many types of payment options, and support in multiple currencies such as GBP, US dollars, RMB, etc. As relationships are built, payment plans can be established so that payments can be made on a predetermined time frame after receipt of the invoice.
T/T IN ADVANCE (Pay at time of order placement via wire transfer)
How to Ship Electronic Components?
We take great care when shipping electronics overseas. Both the U.S. and U.K. governments have imposed restrictions on air transport of electronics, according to the International Air Transport Association.
1. Understand the shipping rules of the destination country
Different countries have different regulations for shipping electronic equipment, check for certain certifications, and read the destination country's guidelines before shipping to prevent delays or confiscation of goods by customs.
2. Choose a reliable express logistics provider
From providing pick-up service to checking the status with real-time order number, conveniently track packages. At present, the logistics providers we cooperate with more include DHL, UPS, Fedex, TXT.
Of course, if you have a long-term cooperative freight forwarder or your own company's logistics account, you can pick up the goods directly from our warehouse
3. How much does it cost to ship the electronic components?
The shipping cost of electronic products depends on the size and weight of the package and the shipping distance. You can first ask us about the size/weight of the products we sell to estimate the shipping cost.
4. How long does it take to ship the electronic components?
If electronic component in stock, it is usually shipped before 5 o'clock on the same day, and it usually takes 5-10 working days to complete it by international express.
If it is a scheduled component, it needs to wait for the arrival of the parts, and then it will be inspected before delivery. If there are special circumstances, the sales staff will confirm with you. Weekends and holidays will also affect the delivery time of electronic products.